Our Work
Selected anonymized stories that show challenge, approach, outcomes, and what scaled next.
Challenge
A multi-building HQ required standards and cyber posture before a large-scale rollout.
Approach
Defined portfolio standards, supervisory layer design, and secure integration patterns with acceptance criteria.
Outcomes
Energy reduction, fewer service calls, and faster device onboarding across subsequent sites.
Challenge
A flagship refurbishment needed a converged network, MSI governance, and analytics-led operations.
Approach
Vendor-neutral MSI advisory, CNS design, tender packs, and 90-day tuning after handover.
Outcomes
Verified comfort and energy KPIs and a repeatable playbook for the developer.
Challenge
An industrial campus sought a clear pathway to reduce emissions and utility spend.